The gap
Strong clinical work, almost no disclosure path, and a break between the bedside, a prototype, and anything that can be made again.
A room inside MEDRA · SMITT
25 m × 5 m · 125 m² at Smouha. Redistributed from the mother brief, which drew the same journey across 400–600 m².
Mother project
The 2026 strategic deck calls the mother effort IP-ITTO: intellectual property, innovation, and technology transfer for the Faculty of Medicine. The founding order already names the operating center. MEDRA is the name on the door. SMITT is the name in the decree. They are one institute.
AEDTH is the fabrication house. This bay is where that house stands. The deck is not a second institute, and it is not a licence to treat patients or to sell implants.
Strong clinical work, almost no disclosure path, and a break between the bedside, a prototype, and anything that can be made again.
A dense hospital, medicine beside engineering and pharmacy, and a port city with workshops. The deck’s reasons match the order that put the center here.
Import dependence and supply shocks are the deck’s case for making training goods locally. They are not a claim that this bay already replaces a device line.
The deck runs every idea from ideation to clinical implementation. Only the first steps have a home. Each later stage stays closed until a named owner and a counsel exist.
The deck’s two-tier rule: hear every class of idea, incubate a few. In this bay the few are simulation, non-diagnostic planning, and frugal training goods.
Stroke, cardiovascular and endoscopy fixtures. This is the AEDTH playbook, and it is what the wet room is sized for.
Triage and segmentation as planning tools. Non-diagnostic until a separate registration says otherwise.
Jigs and organisers the hospital already imports. Prototypes in year 1. Not registered devices.
Competency sheets and disclosure files. Not a regional guideline authority.
The deck proposes a seven-member board. Four of those chairs are already the oversight of MEDRA · SMITT. Two external seats are not filled. Nothing here appoints them.
Before the door is treated as open, three policies have to be signed: how an idea comes in, who owns it, and who must keep it quiet. The deck says adoption stays slow without them. The year-1 disclosure clinic is that work, not a substitute for counsel.
Redistributed plan
The deck’s prototyping heart alone was 80–100 m², inside a 400–600 m² center. The cell that can actually be built here — airlock, print, wet cast, stores — is 62 m². The other 63 m² are the dry rooms that feed it.
The deck’s innovator hot-desks, pantry, toilets, and twelve-seat board are not in this rectangle. Hot-desk inventors book the table in the studio. The board meets in the hospital. Confirm a second way out and the extract route with the safety office before fit-out. This drawing is not a construction issue.
Illustrated to scale. Gaps in the north wall are corridor doors. The airlock, print room and wet room connect internally. Select a room.